Highway Corridors · NEVI · CDOT · Municipalities

Public DC Fast Charging

DC fast charging deployment for public corridors, municipal sites, and incentive-funded infrastructure. High-load service design, grant-aligned documentation, and uptime requirements built around public expectations and program compliance.

NEVI & CDOT Aligned Utility Service Coordination Public Uptime Standards
Why DCFC Is Different

High-Load, Public-Facing, Program-Driven

DC fast charging is the highest-load EV infrastructure category. Sites typically require three-phase service upgrades, utility coordination from day one, and conduit and switchgear sized for sustained high-output operation.

Public DCFC is also program-driven — NEVI, CDOT, and Charge Ahead Colorado deployments come with uptime expectations, documentation obligations, and reimbursement requirements that have to be designed in from the start.

Public DCFC · Corridor
High-Output Public Charging NEVI-aligned site design, utility coordination, and program documentation.
Typical service capacity
480V three-phase, often new service
Utility coordination
Required from day one
Grant alignment
NEVI · CDOT · Charge Ahead CO
Uptime requirement
Program-mandated, typically 97%+
Recommended maintenance tier
Tier 3 — Operational SLA
Public Corridor · Colorado
Statewide DCFC Deployment High-output public charging infrastructure across Colorado corridors — engineered, installed, and supported for program-compliant uptime.
What EVICO Provides

Public DCFC Deployment Scope

Service 01

Service Capacity Engineering

High-load service design — 480V three-phase, transformer sizing, and new service feasibility for sites without existing capacity.

Service 02

Utility Coordination

Interconnect applications, transformer upgrade coordination, and service scheduling with Xcel Energy, Black Hills, and Colorado rural co-ops.

Service 03

Site Civil & Layout

Pad design, bollard placement, conduit routing, and traffic circulation engineered for public access and equipment protection.

Service 04

DCFC Equipment Installation

EVITP-certified installation of high-output DCFC equipment — switchgear, dispensers, dispensers, and supporting infrastructure.

Service 05

NEVI & Grant Documentation

Program-aligned documentation for NEVI, CDOT, and Charge Ahead Colorado — from application through reimbursement reporting.

Service 06

Operational SLA Maintenance

Tier 3 program — defined response windows, parts and labor coverage, and uptime reporting structured for program compliance.

Next Step

Planning a DCFC site or corridor deployment?