Commercial Property Charging
Tenant and visitor charging built around the realities of commercial properties — phased deployment, scalable conduit, Colorado code documentation, and infrastructure that earns its lifecycle cost back through tenant value and asset positioning.
Charging That Earns Its Lifecycle Cost
Commercial charging serves two audiences — tenants who expect it as a baseline amenity, and visitors whose dwell time creates the value. Infrastructure has to support both without overbuilding capacity that may not be used in year one.
Phased deployment, scalable conduit, and code-aligned documentation make the difference between a charger that adds to property value and one that becomes a maintenance liability.
- Typical user mix
- Tenant, visitor, employee
- Deployment model
- Phased, scalable conduit
- Billing & access
- Mixed — open, restricted, paid
- Grant eligibility
- Xcel Energy · CDOT
- Recommended maintenance tier
- Tier 2 — Preventative
Commercial Property Deployment Scope
Site Assessment
Electrical capacity review, parking layout evaluation, and user-mix analysis specific to commercial property operations.
Phased Conduit Design
Scalable conduit routing sized for future station additions — pay for build-out as utilization justifies, not all at once.
Tenant & Visitor Access
Access control, billing logic, and station configuration aligned to your tenant agreements and visitor-use policy.
EVITP Installation
Conduit, panel work, equipment mounting, and commissioning — surface lot, structured parking, and covered canopy environments.
Code & Permitting
Colorado AHJ plan review coordination, permit support, and documentation aligned to local code and inspection requirements.
Maintenance Programs
Ongoing monitoring and preventative maintenance. Tier 2 is the commercial standard for properties with tenant-facing reliability expectations.
Planning EV charging for your commercial property?